A unique prefabricated structure with a patented system for connecting wooden panels to the steel pontoon framework.
Implemented on Ada Međica in Belgrade using a traditional approach with a mobile crane. The wooden structure was specially designed to withstand dynamic forces occurring on water.
Assembly time: 14 working hours.